Design Build Contractor: Constructive Solutions, Inc.
Engineer: N/A
Schedule:
The lobby upgrade project at 351 California Street in San Francisco, CA, encompassed a comprehensive transformation that involved multiple phases. The project began with abatement and careful demolition to ensure safety, followed by the restoration of existing features. New drywall was installed, and fresh paint was applied to revitalize the space. Custom panels and millwork were added for an elegant finish, while electrical upgrades improved functionality. The installation of a new elevator enhanced accessibility, alongside new railings and ramps for user convenience. Masonry work strengthened structural integrity, and modern furniture contributed to a welcoming atmosphere. Glazing and updated lighting created a bright and inviting environment, complemented by new wall coverings and tile. A state-of-the-art fire alarm system was also installed for safety compliance. Overall, the project significantly enhanced the lobby’s appearance and functionality.